Project process
An interior handover checklist for your new home
Prepare a practical room-by-room handover list for finishes, fittings, documents, pending items and maintenance.

Handover is easier when the agreed scope is available beside you. Keep the approved drawings, specifications, quotation revisions and change records together. Review each room against these documents and record any pending item clearly.
Check room by room
Look at visible surfaces, edges and junctions under normal room lighting. Open and close accessible shutters and drawers, check the agreed storage arrangements and note items that need adjustment. Photograph each concern with its location instead of relying on a general description.
Review operation with the right person
Ask the installer to demonstrate fittings, appliances and controls within their responsibility. Electrical, plumbing and other specialist checks should be carried out by the qualified trades involved. A homeowner’s visual walk-through does not replace technical testing or required approvals.
Create a written pending-work list
For every unresolved item, record what needs to be done, who is responsible and the agreed target date. Distinguish corrections from new requests. Keep the list updated when work is completed and acknowledged by both parties.
Collect the documents
Request invoices, product model details, applicable warranty documents and maintenance instructions. Confirm how to raise a service request and which party handles it. Avoid assuming every item has the same warranty period or that workmanship and product warranties are interchangeable.
Learn the care routine
Ask which cleaning methods are suitable for the actual finishes and where replacement components can be sourced. Keep spare materials or touch-up references where agreed. Record the location of accessible service points and explain them to the people who will use the home.
Close the project against the agreement
Review outstanding payments and the handover record using the accepted contract and changes. A clearly documented handover helps both parties understand what has been delivered and what remains. For a new project, discuss this process before work begins.